Hi-Tech Plant

Provider of Global Technical Solutions for the construction of a sustainable future society

SK ecoplant has put together a diverse portfolio for the industrial plant business, which includes semiconductor, electric vehicle battery and battery basic material manufacturing facilities, and the power plant business.

Boasting an array of successful construction projects, highly skilled manpower, and in-depth know-how, we now hold world-class capability in every phase of the project life cycle, thus enabling us to deliver optimized services to customers in every corner of the world.
As for the Industrial Plant Business, our reputation as the best business partner has been reinforced by our successful deployment of the Super-Fast Track strategy and completion of mammoth semiconductor factory construction projects such as M14, M15, and M16.

We are consistently expanding our business territories by carrying out a LiBS (Lithium-ion Battery Separator) project to build its manufacturing facility, which is the core material for electric vehicle batteries. In addition to that, our proven capability in global project management consulting has won us the SKBA Phase 2 Project, where we are positively fulfilling the needs of our customer’s demand for a higher value-added industrial plant.

Furthermore, by enhancing our technological competitiveness with the establishment of a modular data center and an eco-friendly urban data center standardization model, we have expanded our business by becoming a developer of eco-friendly technology & solution based data centers. We have also secured sustainable future growth engines by entering the hydrogen/eco-friendly service sector, including hydrogen liquefaction, battery metal recycling, and waste plastic recycling businesses.
Utilizing the expertise on various products and competences it has accumulated, Eco Hi-Tech aims to generate stable profits and become a well-established provider of total solutions packages in the hydrogen/eco-friendly service sector.

SK ecoengineering provides unrivaled services in batteries and core materials for batteries, including LiBS, hydrogen and eco-friendly projects, and power plants using the technically-skilled human resources and experience it has accumulated while executing numerous projects around the world. Our customers come back repeatedly due to the trusting relationship they have developed with us in receiving the best value, as we concentrate on industries of the future (including rechargeable batteries and LiBS), eco-friendly projects (eco-friendly hydrogen and plastic recycling, etc.), and LNG power generation infrastructures. At SK ecoengineering, we create both social and economic value.
Based on its Hi-Tech engineering capabilities, SK ecoengineering will mobilize all its capabilities to establish itself as a provider of Net Zero Tech Solutions that leads the green energy field and adds new value to the Earth.

  • Industrial Plant Domestic
    Yongin Cluster Phase-1 PJT
    Order
    SK hynix
    Period
    2024.01 ~ 2027.05
    Scale
    Site Area : 2,026,837㎡ (Total 4 FABs), Building Area : 189,432㎡ (Phase-1 of 1st FAB), Total Floor Area : 1,253,517㎡ (Phase-1 of 1st FAB)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M16 EUV Section Finish Construction
    Order
    SK hynix
    Period
    2023.10 ~ 2024.08
    Scale
    Clean Room 6,413m² (1,940Py)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M15 HBM Project
    Order
    SK hynix
    Period
    2023.07 ~ 2024.08
    Scale
    Clean Room Area 10,725m² (3,250Py)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M15 Ph-2 WWT Project
    Order
    SK hynix
    Period
    2021.09 ~ 2024.06
    Scale
    Ph-2B WWT PJT standard) Wastewater treatment plant : 1 basement, 5 floor above ground / 40.49M, Dehydrator building : 3rd floor /24.75M
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix Icheon Campus Technical Support Center 2nd floor Data Center Construction
    Order
    SK hynix
    Period
    2023.06 ~ 2024.01
    Scale
    Building Area : 4,950m² (1,497Py)
    Perform
    C
    View
  • Industrial Plant Domestic
    SK Hynix M16 Power Infrastructure Construction
    Order
    SK hynix
    Period
    2019.05 ~ 2023.07
    Scale
    Extension of Underground Line about 25.3 km, 345kV Substation (1st basement floor, 3rd floor above ground)
    Perform
    EPC
    View
ScrollTop