Hi-tech

SK ecoplant provides a AI Infra services optimized for advanced industries, extending from semiconductor manufacturing facilities to industrial complexes and operation solutions.

Total Semiconductor Infra

Based on Korea's only semiconductor manufacturing facility (fab) design and construction integration capabilities, it is strengthening its position as an optimal infrastructure partner in the AI era.It has successfully completed mega-project manufacturing facilities such as M14, M15, and M16 and has proven its mega-project capabilities, and based on abundant construction performance and accumulated technical know-how, we are realizing customized air reduction and flawless operation.We are pursuing a project to build a global semiconductor cluster in response to the global HBM and AI chip demand accelerated by AI, and we are creating sustainable growth value by providing semiconductor integrated infrastructure solutions

Semiconductor Cluster

Yongin Semiconductor Cluster is a project to create a national strategic industrial complex for the production of AI semiconductors and HBMs, which is being built on 4.15 million square meters of land, about 1.4 times the size of Yeouido. For the first time in the world, a clean room is being built as a three-story high-rise multi-fab located on each floor, and it is contributing to strengthening the competitiveness of the domestic semiconductor industry through the design and creation of the world's best advanced fab infrastructure. By carrying out the project, we are also taking the lead in realizing win-win values to revitalize the local economy.

Operation Solution

We provides a sustainable operation solution by developing and securing air and water treatment technology optimized for semiconductor manufacturing facilities. Through its own technology development and joint development with technology partners, it provides solutions that can contribute to the improvement of the competitiveness of Hi-tech customers. Based on the successful commercialization of the world's best water reuse technology(CSRO) and air pollution treatment solution, we intend to continue to expand the operational solution area.

  • Industrial Plant Domestic
    Yongin Cluster Phase-1 PJT
    Order
    SK hynix
    Period
    2024.01 ~ 2027.05
    Scale
    Site Area : 2,026,837㎡ (Total 4 FABs), Building Area : 189,432㎡ (Phase-1 of 1st FAB), Total Floor Area : 1,253,517㎡ (Phase-1 of 1st FAB)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M16 EUV Section Finish Construction
    Order
    SK hynix
    Period
    2023.10 ~ 2024.08
    Scale
    Clean Room 6,413m² (1,940Py)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M15 HBM Project
    Order
    SK hynix
    Period
    2023.07 ~ 2024.08
    Scale
    Clean Room Area 10,725m² (3,250Py)
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix M15 Ph-2 WWT Project
    Order
    SK hynix
    Period
    2021.09 ~ 2024.06
    Scale
    Ph-2B WWT PJT standard) Wastewater treatment plant : 1 basement, 5 floor above ground / 40.49M, Dehydrator building : 3rd floor /24.75M
    Perform
    EPC
    View
  • Industrial Plant Domestic
    SK Hynix Icheon Campus Technical Support Center 2nd floor Data Center Construction
    Order
    SK hynix
    Period
    2023.06 ~ 2024.01
    Scale
    Building Area : 4,950m² (1,497Py)
    Perform
    C
    View
  • Industrial Plant Domestic
    SK Hynix M16 Power Infrastructure Construction
    Order
    SK hynix
    Period
    2019.05 ~ 2023.07
    Scale
    Extension of Underground Line about 25.3 km, 345kV Substation (1st basement floor, 3rd floor above ground)
    Perform
    EPC
    View
ScrollTop